The practical answer.
Set a storage limit from the measured current that still leaves the LiFePO4 battery in the approved shutdown arrangement, plus any separate battery storage assumptions. Calculate charge loss over the planned storage period, keep a minimum reserve specified by the design owner, and schedule the first follow-up check before that reserve could be reached. An off display or BMS warning alone does not establish electrical isolation.
- List the paths that can still draw current with the user controls off.
- Calculate using logged average current and approved assumptions for time, temperature and reserve.
- Treat low-cell shutdown as a protection event, then follow the supplier's authorized service procedure.

Define what the equipment actually does when switched off
A control panel can go dark while a relay, network gateway, alarm or charger remains electrically connected. Start your storage review with the approved wiring drawing, and mark which circuits remain powered when the operator uses the normal switch. Repeat the exercise for an installation where the equipment is placed into its authorized long-term storage state. An auxiliary load drawn upstream of a disconnect will not disappear just because another branch is switched off. Identify the owner and expected purpose of each retained path.
Victron's Smart BMS CL 12-100 guidance lists off-state consumption, relays and charger or regulator back current as examples of small loads that can discharge a lithium battery during nonuse. It also calls out the particular risk of continuing residual discharge after a low-cell protection event. Those warnings are useful review prompts. The numeric reserve and recommended actions in that manual belong to the named configuration. Ask the supplier and equipment owner for the approved reserve and storage method applicable to yours.
Distinguish ordinary standby, intended storage and a protective shutdown. These terms refer to three different operating states. Standby may retain features needed for the next startup. Planned storage is a controlled handover with specified electrical paths, authorized isolation where applicable and a check date. Protection is the equipment's response to an abnormal state. Set normal operating and storage limits so that the last of these is not used as the routine stopping point.
Assign a measured baseline to each retained branch
Prepare a small branch register before collecting a terminal current trace. For each path, state what physically connects it to the battery, whether it changes state on a schedule and how the authorized system reports that state. Identify accessories with their own buttons, relays held energized, always-on data connections and charging devices whose input source may be absent. Use the actual released wiring and option list. In a fleet, an optional tracker can create a different storage demand from the original configuration even when the installed battery is identical.
Choose a measurement boundary and sign convention. Outgoing battery current is positive in the illustrative worksheet below. Treat charging periods separately if they occur because averaging positive and negative readings without checking their timing can obscure a slow discharge. A measurement on the controlled equipment output cannot represent a branch that bypasses it. An external terminal measurement also may not represent the battery's internal management electronics or self-discharge. Obtain any missing internal characteristics from supplier evidence and document which assumptions already account for them.
The qualified commissioning team should select an instrument and connection method suitable for the installation. Discuss resolution, zero offset and the length of the logging window. A meter that rounds several milliamps to zero can fail to resolve a material parked load, while a short sample can miss a periodic wake-up. The instrumentation itself may change the connected circuits or keep a communications device active. Record how the setup influences the result and repeat the capture if that influence exceeds the precision needed for a usable decision.
| State | What to verify | Useful evidence |
|---|---|---|
| Operator off | Live accessories, timers and lights | Released wiring drawing and logged current |
| Storage handover | Authorized isolation and any required retained circuits | Service instruction and measured stable current |
| External power absent | Whether a charger or regulator remains connected | Approved interface description and signed current trace |
| Periodic wake | Duration and frequency of ordinary scheduled events | Time-stamped event and integrated current |
| Protective disconnect | Indicator and required service escalation | Supplier guidance and equipment status record |

Convert intermittently logged current to charge loss
Use amp-hours for the external draw estimate. A continuous current multiplied by elapsed hours gives the charge removed. For varying current, integrate the trace directly or multiply each state current by its observed cumulative duration and add the results. A rate quoted at a named equipment input is not automatically the rate at the battery terminals. Conversion hardware and parallel loads may change the relationship. Use units and measurement boundaries that an independent reviewer can reproduce.
Consider an illustrative system that draws 8 mA for 23 hours and 40 mA for one hour of each day. Its external loss is 0.008 A × 23 h plus 0.040 A × 1 h, or 0.224 Ah per day. Over 30 days the calculated external loss is 6.72 Ah. This example assumes the same duty every day and excludes internal pack draw and self-discharge. It is a demonstration of the method rather than measured performance or a reserve recommendation.
Next, compare the forecast loss with the available allowance between storage-entry conditions and the required minimum reserve. For example, imagine the responsible team has agreed an allowance of 12 Ah for the same setup and assigns 2 Ah to combined internal loss and uncertainty over 30 days. The example would use 8.72 Ah of the allowance. If one sensor is later changed to wake twice as often, the allowance still has to be reassessed because the daily profile is different. Keep the original assumptions alongside the revised forecast so that the reason for any new check interval remains visible.
Review the pack condition without reading more into the SOC display
State of charge estimates can be useful to service teams, but no single display reading verifies the path or future load. Different models and installed gauges estimate remaining charge using different information. Document which indicator and measurement are approved for checking the storage condition. Keep the assumptions for temperature and time within the supplier's specified boundary. If a reading as recorded at handover is uncertain, raise the reserve assumption or shorten the initial inspection interval as approved by the system owner.
Reserve sizing must also consider the work expected after storage. A fully idle system may only need an inspection before connection to its authorized charger. Equipment with standby obligations may need a defined response when external power does not return. Assign those cases separately so that a parked throwaway calculation does not substitute for a backup requirement. If the outcome is an ambiguous battery condition, the maintenance procedure should spell out the next service action rather than leaving the operator to decide from a percentage change alone.
Record the approved isolated condition for the battery itself and connected equipment. If someone changes a harness, monitoring function, charger settings or operating firmware, the current budget needs a review. The changes can alter wake schedules, off-state current or measurement visibility without moving the battery terminal or creating an obvious mechanical difference. Give the service and purchasing teams access to the document revision and the process for reporting an option installed outside the documented configuration.
Set an owner and a practical first inspection date
Use the shorter of the user-approved maintenance interval and the interval supported by the reviewed assumptions. Where the first measurement does not cover all relevant states, start with a conservative check and update the schedule using representative data. Include planned storage duration, authorized storage method, equipment and battery identity, inspection point, minimum reserve criteria and responsible role. If an onboard reminder cannot run while the equipment is isolated, make the owner's service schedule independent of that device.
Provide separate actions for an acceptable observation, a result requiring diagnosis and a low-cell protection event. The pack maker's written procedure should govern recovery and charging in the abnormal case. Do not treat a protective disconnect as a starting step for storage or an invitation to improvise recovery. Save the last good trace and note the most recent charger, accessory and firmware changes so a technician can investigate a disagreement between the plan and the observation.
Start a Jetray inquiry with the 12V or 24V family reference if useful, then send the equipment schematic boundary and the storage duty assumed in the worksheet. Ask the supplier to confirm the exact model's allowed storage conditions, retention assumptions and approved procedure. The answer may depend on the proposed BMS option and connected equipment. Keep that written confirmation with the receiving and maintenance documents so the storage decision survives a change in staff or supplier.
Audit the handover after the first real storage period. Compare average current in both logged windows, list accessories found connected that were absent from the drawing, and record the person who accepts the revised check interval. Treat the date as an operational commitment shared by service and purchasing.
FAQ
Does ten days of steady terminal voltage prove the standby draw is negligible?
No. A voltage snapshot cannot identify every current path or periodic event. Use a suitable logged current measurement, documented internal assumptions and the approved condition checks for the model.
Should the same storage interval apply after a charger or tracker replacement?
Review the revised circuit first. If the accessory can change off-state or periodic current, document the resulting charge budget and adjust the inspection schedule using the authorized process.
Sources & further reading
- Victron Smart BMS CL 12-100 installation and configuration, residual draw warning ↗
- Victron Lithium NG 12.8 V battery operation ↗
- Jetray product catalogue ↗
Confirm the proposed model, system configuration and applicable evidence with the supplier and responsible engineering team.
Prepared for the lifepo4 battery packs collection. General engineering guidance does not replace a model-specific datasheet or application validation. Source review: 16 November 2026.