Confirm system voltage
A voltage-family label is not a complete specification. Confirm operating and charging limits for the selected model.
Jetray’s corporate website describes cell selection, BMS design, prototyping and custom pack services. Use this brief to discuss the scope and feasibility of your own project.
A focused LiFePO4 product collection for equipment, backup and storage projects. Compare voltage families and mechanical formats before discussing a system design.

Photograph from the Jetray corporate factory page.
A voltage-family label is not a complete specification. Confirm operating and charging limits for the selected model.
Check charger settings, temperature limits and restart behavior against the battery specification.
Confirm terminals, mounting, cable protection and the acceptance conditions for the installed system.
Nominal system voltage, allowable input window, continuous current, peak current and peak duration.
Available envelope, fixing points, weight constraints, cable routing, connector and polarity.
Charger model, charging opportunities, temperature sensing and required BMS or communication signals.
Intended use, target markets, sample quantities, forecast volume, required test evidence and revision controls.
Use these review gates to organize a project discussion with the supplier. The agreed scope and deliverables are confirmed for the individual project.
| Stage | Information to align | Decision to record |
|---|---|---|
| Requirements brief | System voltage class, allowable input range and charging limits; Installation location, charge-temperature limits and mounting | The equipment needs, mandatory limits and open questions. |
| Configuration review | Define terminals, mounting, charger behavior and any series or parallel arrangement that the exact model permits. | The proposed model or design scope, interface drawing and document revision. |
| Sample evaluation | Representative equipment, operating cycle and acceptance procedure. | Results, deviations and changes needed before the next stage. |
| Order preparation | The approved configuration, quantity, packaging and required shipment documents. | The purchase specification, acceptance method and agreed commercial terms. |
Share the load, dimensions and intended use. Ask for a current model specification and a project review.